Field-ready installer tool

Map every switch.
Leave with the schedule.

Record TX numbers, switch locations and assigned loads while you walk the job. Your work saves on this device and exports to Excel when the schedule is complete.

Start Entering TX Units
01 / Project

Job details

These details appear at the top of the exported workbook.

02 / TX Schedule

Switch assignments

TX numberSwitch locationAssigned load
03 / Finish

Export the handoff.

Your spreadsheet includes project details, every TX assignment, installer notes and a sign-off line.